Analog Devices ADP1607 Evaluation Board ADP1607-EVALZ ADP1607-EVALZ データシート

製品コード
ADP1607-EVALZ
ページ / 8
Evaluation Board User Guide 
UG-488 
 
Rev. 0 | Page 3 of 8 
EVALUATION BOARD HARDWARE 
The 
 evaluation board is fully assembled and tested. 
The following sections describe the various connectors on the 
board, the proper evaluation setup, and the testing capabilities 
of the evaluation board. 
INPUT/OUTPUT CONNECTORS 
EN Test Bus 
The EN connector is used to enable/disable the converter via 
the EN pin. Use one of the following methods to enable the 
converter. Do not leave the EN pin floating. 
•  Use a jumper to connect the top two pins of the EN test 
bus. This connects EN to VIN and enables the converter 
(see Figure 2)
PLACE
JUMPER
HERE
1
1089-
002
 
Figure 2. Enabled Jumper Position 
•  Use a jumper to connect the bottom two pins of the EN test 
bus. This connects EN to GND and disables the converter 
(see Figure 3)
PLACE
JUMPER
HERE
1
1089-
003
 
Figure 3. Disabled Jumper Position 
•  Alternatively, connect a voltage between VIN and GND to the 
center pin of the EN test bus for independent control of the 
EN pin voltage (see Figure 4)
CONNECT
EXTERNAL
DEVICE
HERE
1
1089-
004
 
Figure 4. EN Pin Direct Connection  
VIN Test Bus 
The VIN test bus connects the positive input supply voltage to 
the VIN pin. Connect the power supply to this bus and keep the 
wires as short as possible to minimize EMI transmissions. 
SW Test Point 
The SW test point is for monitoring the switch node (SW pin) 
behavior and switching frequency. Connect a BNC cable to this 
test point to measure the 
switching frequency. 
VOUT Test Bus 
The output voltage at the VOUT test bus is set by the resistive 
voltage divider network, R1 and R2. A load can be attached 
from the VOUT test bus to the GND test bus. 
GND Test Bus 
The GND test bus is the power ground connection for the part 
via the GND pin as well as the bypass capacitors. Connect ground 
connections from external equipment to this bus. 
EVALUATION SETUP 
To ensure proper operation of th
 evaluation board: 
1.  Connect the input supply ground to GND. 
2.  Connect the positive input supply to VIN. 
3.  Connect the desired load between VOUT and GND. The 
maximum continuous output current of th
dependent upon the input and output voltage conditions. 
4.  Apply a voltage between 0.9 V and V
OUT
 to the VIN test bus. 
5.  Move the jumper on the EN test bus to the enabled position. 
PERFORMANCE EVALUATION 
The following sections discuss tests and the resulting oscilloscope 
waveforms. Oscilloscope waveforms and typical performance 
characteristics are provided in th
data sheet.  
Line Regulation 
The line regulation is observed and measured by monitoring 
the output voltage (VOUT) while varying the input voltage (VIN). 
Load Regulation 
The load regulation is observed and measured by monitoring the 
output voltage (VOUT) while sweeping the applied load between 
VOUT and GND. To minimize voltage drop, use short low 
resistance wires, especially for heavy loads. 
Efficiency 
The efficiency, η, is measured by comparing the input power to 
the output power. 
IN
IN
OUT
OUT
I
V
I
V
×
×
=
η
 
Line Transient 
The line transient performance is evaluated by generating a high 
speed voltage transient on the input (VIN) and observing the 
behavior of the evaluation board at the output (VOUT). 
Load Transient 
The load transient performance is evaluated by generating a fast 
current transient on the output (VOUT) and observing the 
behavior of the evaluation board at the output (VOUT.)  
Oscillator Frequency 
The oscillator frequency can be measured by connecting an 
oscilloscope to the SW pin.  
Inductor Current 
The inductor current is made accessible by removing one side 
of the inductor from its pad and connecting a current loop in 
series. Place an oscilloscope current probe on the loop to view 
the current waveform.