Reely ARF 1095 mm 208918 データシート

製品コード
208918
ページ / 84
34
h) Mounting the Flight Controller
Figure 7, item 1 shows a possible installation site for
the flight controller. The assembly must be selected
individually according to flight controller used.
Figure 7, item 2 shows the assembly site of the
rechargeable battery. Here too, the later installation and
fastening must be performed individually with hook-and-
loop tapes.
i) Mounting the Motor Cowl
Adjust the motor cowl and transfer to the spinner at
your own discretion depending on the motor.
Independently of this, observe matching cooling of the
drive. Use the information from figure 8a as reference.
The motor cowl is attached to the bottom of the fuselage
with three grub screws 2 x 6 mm each on the left and
right (figure 8b). Pre-drill the corresponding small holes
in the motor carrier for this.
The motor cowl must be installed so that the distance
of the spinner back plate to the motor cowl is approx.
2 - 3 mm.
Practical advice:
To be able to drill the perfectly matching holes for the
screws of the motor cowl, attach two paper strips to
the left and right of the fuselage with adhesive tape
with the motor cowl removed (figure 8a, item 1).
The paper strips must be attached so that the holes to
be drilled at the motor carrier can be marked on the
paper strips.
Then fold the paper strips back again, apply the motor
cowl and mark the drill holes at the motor cowl as
indicated on the paper strips.
Figure 7
Figure 8b
Figure 8a