Patterson-Kelley MOD-04 ユーザーズマニュアル

ページ / 54
 Modu-Fire
® 
Gas-Fired Boiler 
Maintenance 
 
 
 26 
 
 
8.  Before re-installing the burner, check the 
cleanliness of the heat exchanger and the condi-
tion of the combustion chamber.  If corrosion or 
leaks are noticed, (green or otherwise, please 
call the factory for assistance) 
9.  Install the burner and mixer core.  Reconnect 
the pilot tube, main gas union, 4 burner hold 
down nuts, electrode wire, ground wire, mixer 
core tube, UV Scanner.  Be sure the Pilot tube is 
not touching any other component. 
 
 
5.3
  
R
EMOVING THE 
E
XCHANGER
 
1.  Remove the burner as above. 
2.  Remove the front doors by pulling forward and 
upward. 
3.  Remove the top panel of the inner cabinet. 
4.  Close the isolation valves to the system. 
5.  Drain the boiler. 
6.  Disconnect the supply and return lines. 
7.  Remove the manifold assembly containing the 
temperature-pressure indicator, relief valve and 
the water flow switch (on the D series units dis-
connect at the grooved pipe coupling [Victau-
lic]). 
8.  Remove the nuts and bolts from the flanges of 
the inlet and outlet nozzles at the rear of the 
outer casing. 
9.  Remove the exchanger and clean the fins. 
 
Note:  The inner and outer cabinets are separate 
parts and reassembly is easier if the inner cabinet 
and exchanger are removed together as one unit.   
 
WARNING! 
The heat exchanger is heavy; use proper lifting 
equipment and techniques. 
 
 
5.4
  
A
FTER 
A
LL 
R
EPAIRS OR 
M
AINTENANCE
 
 
1.  Follow "Pre-Start Check List" (Section 3.10) 
and all "Safety Checks" (Section 3.11). 
2.  Check gas pressure and adjust gas flow if neces-
sary.  (See "Gas Pressure Adjustment", Section 
3.12.3.) 
3.  Check air pressure and adjust air flow if neces-
sary.  (See "Air Flow Adjustment", Section 
3.12.2.) 
4.  Perform combustion check.  
 
 
Pilot 
Tube 
Ceramic Spider 
Ignition 
Electrode