HP Performance Optimized Data Center (POD) 40c サービスマニュアル

ページ / 82
 
Periodic maintenance  69 
Component to be inspected 
Task 
Frequency 
Capable Party 
— 
Exterior water proofing check for 
ingress using water hose 
Annually 
Certified facilities 
personnel 
 
 
Switchgear 
 
Component to be inspected 
Task 
Frequency 
Capable Party 
Switchgear 
Infrared inspection of all electrical 
power connections while under 
normal load 
Annually 
HP and certified 
facilities personnel 
— 
Grounding and electrical systems  Annually 
HP and certified 
facilities personnel 
— 
Panel operational testing 
Annually 
HP and certified 
facilities personnel 
— 
Breakers/disconnects 
Annually 
HP and certified 
facilities personnel 
 
 
Third-party components 
See the Operations and Maintenance Manual for the HP Performance Optimized Datacenter 40c for other 
required maintenance items. 
 
UPS 
 
Component to be inspected 
Task 
Frequency 
Capable Party 
UPS 
Vacuum Pump oil change 
Annually 
HP 
— 
Log file review 
Annually 
HP 
— 
Calibration verification 
Annually 
HP 
— 
Telemetry review 
Annually 
HP 
— 
Replace bearings 
Every 2.5 to 3 
years 
HP