Bunn DG-2 ユーザーズマニュアル
23
L.E.D
The L.E.D is located on the front of the grinder
just above hopper selector switch.
Test Procedure:
1.
1.
Unplug the grinder.
2.
Remove the wire nuts from both sets of wires.
3.
With a voltmeter set to read DC volts. Attach the
positive (+) lead to the black and pink wires and
the negative (-) lead to the gray wires.
positive (+) lead to the black and pink wires and
the negative (-) lead to the gray wires.
4.
Connect grinder to the power supply.
5.
Initiate a grind cycle. Voltage should be approxi-
mately 2 volts DC.
mately 2 volts DC.
If the voltage is present as described the L.E.D. is
operating properly.
If the voltage is not present as described proceed to
#6.
operating properly.
If the voltage is not present as described proceed to
#6.
6.
After initiating a grind cycle in step #5 the volt-
age was approximately 5 volts DC. Replace the
L.E.D. If the voltage is approximately 0 volts re-
fer to wiring diagrams and check the wiring har-
ness.
age was approximately 5 volts DC. Replace the
L.E.D. If the voltage is approximately 0 volts re-
fer to wiring diagrams and check the wiring har-
ness.
Removal and Replacement:
1.
1.
Remove upper front inspection panel.
2.
Disconnect PNK and GRY wires from L.E.D.
3.
Using a 5/16" open end wrench remove nut on
back of front housing securing L.E.D. Remove
L.E.D and discard.
back of front housing securing L.E.D. Remove
L.E.D and discard.
4.
Install new L.E.D through front of grinder hous-
ing and secure with nut.
ing and secure with nut.
5.
Connect PNK and GRY wires from L.E.D. Refer
to wiring diagram on pages 24 & 25.
to wiring diagram on pages 24 & 25.
Location:
P749
SERVICE (cont.)
00718.0000
01593.0000
P941
Location:
The weigh control assembly is located behind
the lower front inspection panel just under and
behind the funnel rails.
the lower front inspection panel just under and
behind the funnel rails.
Weigh Control Assembly - WDG-2
10854 030300