Gaggenau gaggenau refigerator rc 462/413 rf 411/413 rf 461/463 rf 471 rw 414/464 ユーザーズマニュアル

ページ / 106
14
2.
Attaching an alternative anti-tip 
device
Important note:
If the anti-tip brackets cannot be attached securely, 
an alternative anti-tip-device can be attached. However, 
ensure that there is no play between the appliance and 
the anti-tip-device. If possible, always screw the wooden 
beam to existing studs on the rear panel of the installation 
niche.
1. Saw the wooden beam (cross section min. 3" x 4") 
to the required length. Length is equal to the width of 
the installation niche!
Notes:
– If the installation niche is deeper than the 
appliance, select a beam which has a larger 
cross section or attach 2 beams.
– The beam must cover the appliance by 
at least 2" (50.8 mm).
2. Mark the installation height (lower edge of the beam) 
on the rear panel of the installation niche.
3. Select screws according to the thickness of the 
wooden beam: length = min. 2.5 x beam thickness, 
diameter #12 or #14.
Note:
Choose the number of screws according to the 
installation niche width, thereby ensuring that the 
beam can be attached securely.
4. Depending to the subsurface:
Locate wall studs in the rear of the installation niche 
and accordingly transfer their location to the wooden 
beam
or
fasten suitable dowel into the rear wall.
5. Predrill the wooden beam.
6. Attach the wooden beam to the rear panel of the 
installation niche.
3.
Attaching the edge protectors
To protect the edges of the installation niche, it is 
recommended to attach edge protection made of 
a suitable  material.
Attach the edge protection with the adhesive tape which 
was used to attach the accessories to the appliance.
4.
Attaching the fastening sheets 
(lateral)
Attach the fastening sheets (lateral) to the appliance.
The following are special installation 
steps. Instructions are provided after 
section D.
– Change over door hinge, see 
“Changing over the door hinges”.
– Sealing mat, see “Removing/changing 
the sealing mat”.
– Side-by-Side installation, see “Side-by-
Side installation”.
– Connecting the water, see “Preparing 
to connect the water”.