Centurion CP72SR5 ユーザーズマニュアル

ページ / 36
PROVISION FOR CABLES
- Ensure cables       are fitted through base plate       before concreting
  in place.
- Remove knock-outs       from gearbox to allow for cable entry.
- Route cables in front of battery (D3/D5 motors) as shown above.
- Seal cable entry holes with silicone sealer.
9
47
46
43
47
3
5
0
 m
m
3
0
 m
m
46
43