Centurion CP72SR5 ユーザーズマニュアル

ページ / 36
MOUNTING RACK CONTINUED
200 - 300mm
LEVEL
200mm
58
60
59
12
- A simple way of ensuring correct pitch spacing when joining steel rack is
  to clamp a small offcut       between the two pieces.
- Check that weld       does not foul with meshing surfaces.
- If RAZ ™ rack       is used, then start installing from the right hand side of
  the gate working towards the LHS. Use fastening screws e.g. “TEK” screws
  at least every 200mm. 
58
59
60