York R123 ユーザーズマニュアル

ページ / 156
YORK INTERNATIONAL
152
FORM 160.55-O1 (604)
COMPRESSOR
ELECTRICAL CONTROLS
Maintenance for the compressor assembly consists of 
check ing the operation of the oil return system and chang-
 ing the dehydrator, checking and changing the oil, check-
 ing and changing the oil Þ lters, checking the op er a tion of 
the oil heater, checking the operation of the oil pump and 
observing the operation of the com pres sor.
Internal wearing of compressor parts could be a se ri ous 
problem caused by improper lubrication, brought about 
by restricted oil lines, passages or dirty oil Þ l ters. If the 
unit is shutting down on (HOT) High Oil Tem per a ture 
or Low Oil Pressure (OP), change the oil Þ lter  el e ment. 
Examine the oil Þ lter element for the pres ence of alu-
 mi num particles. Aluminum gas seal rings can contact 
the impeller and account for some alu mi num particles 
to  ac cu mu late  in  the  oil  Þ lter,  es pe cial ly  dur ing  the 
initial start up and Þ rst several months of op er a tion. 
How ev er, if aluminum particles continue to accumu-
late and the same conditions con tin ue to stop the unit 
operation after a new Þ lter el e ment is in stalled, notify 
the nearest YORK of Þ ce to re quest the pres ence of a 
YORK  Ser vice  Tech ni cian.
For information covering the OptiView Control Center 
operation, refer to “Section 2”. The operating points 
of the pressure and tem per a ture cut outs are shown in 
the Wiring Diagrams. These diagrams also contain a 
start ing and stop ping se quence and timing sequence 
di a gram.
Systems's Service offi ce for evaluation. 
After the 500 hour replacement, the oil 
fi lter should be replaced semi-annually, or 
when the operating oil pressure drops 30% 
from the oil pressure measured at the time 
of the previous replacement.
COMPRESSOR MOTOR 
 1. Check motor mounting screws frequently to insure 
tight ness. 
 2. Meg motor windings annually to check for de te -
ri o ra tion  of  windings. 
PRESSURE TESTING 
The chiller should be pressure tested annually. Any leaks 
found must be repaired im me di ate ly.  If  frequent  purg ing 
has occurred, the unit must be pres sure tested as soon 
as pos si ble to prevent air and mois ture from en ter ing 
the until. Air and moisture are the worst enemies of 
the R-123 system and ex pe ri ence has shown that units 
which are maintained tight, are systems that will pro vide 
trouble free efÞ cient  op er a tion. 
It is the responsibility of the owner to provide the nec-
 es sary daily, monthly and yearly maintenance re quire -
ments of the sys tem. IM POR TANT: If a unit fail ure 
oc curs  due  to  im prop er  main te nance  dur ing  the  war ran ty 
pe ri od; YORK will not be liable for costs in curred to 
re turn  the  system  to  sat is fac to ry  op er a tion. 
In any op er at ing system it is most important to provide 
a planned maintenance and in spec tion of its func tion ing 
parts to keep it operating at its peak efÞ ciency. There fore, 
the following maintenance should be per formed when 
pre scribed. 
COMPRESSOR 
Oil Filter
Oil Filter: On all new chiller start-ups, the 
oil fi lter must be changed after the fi rst 200 
hours of operation and again at 500 hours 
of operation to insure proper lubrication 
quality for the compressor. These fi lters 
should be inspected for excessive debris, 
and if found containing excessive debris, 
report this to the local YORK Engineered 
SECTION 9
PREVENTIVE MAINTENANCE
Preventive Maintenance