Valco electronic Valve Oven ユーザーズマニュアル

ページ / 62
Chapter 1
Valve Oven Overview
Installation and Power Requirements
14
When up to two Valco Purged valves are required (e.g. applications with 
Pulsed Discharge Detector), this option has to be selected for their housing.
For more informations, refer to 
.
NOTE
When any Valve box (heated or unheated) is configured with valves, these are factory 
tested to verify actuation but are NOT plumbed.
 
Plumbing can be performed upon availability of plumbing diagrams.
Materials needed:
 Shop air or bottled air at a pressure of 60–80 psi
 Helium, Nitrogen, or other gas depending on your applications
Installation and Power Requirements
The Valve Oven is attached to TRACE GC Ultra and it is factory installed and 
configured. On-site installation is related to the gas plumbing defined by the 
customer’s application or accompanying diagram.
Figure 1-2.  The Valve Oven and the TRACE GC Ultra