Siemens Network Hardware D410 ユーザーズマニュアル

ページ / 150
Configuring SIMOTION D410 
 
3.4 Configuring PROFINET (only for D410 PN) 
 
D410 
58
 
Commissioning Manual, 08/2008 Edition 
3.4.4 
Rules for SIMOTION D410 PN 
Rules for using the PROFINET send cycle 
If the PROFINET send cycle is the basis for the cycles, ensure that the DP cycle of the 
SINAMICS Integrated and the servo cycle are equal.  
The timebase for the system clocks are generated internally if the PROFINET interface is not 
operated with RT class IRT with high performance or IRT with high performance is set, but 
no data is being transferred. This also applies if the PROFINET interface is operated as 
synchronization master with RT class IRT with high performance and data is being 
transferred. The SIMOTION device does not have to synchronize itself with an external 
cycle.  
The basis for system clocks is derived from the clock signals received at the PROFINET 
interface if this interface is operated as synchronization slave with RT class IRT with high 
performance. The SIMOTION device does not have to synchronize itself with this external 
clock. 
A substitute clock of a duration equivalent to the configured clock is generated internally if 
the PROFINET interface has not received a clock signal. 
The clock settings are included in the project download to the SIMOTION device and are 
adjusted according to specification.