Siemens Sitrans F FX300 ユーザーズマニュアル

ページ / 80
3
 INSTALLATION 
28 
SITRANS FX300
www.siemens.com/flow
06/2009 - SFIDK.PS.050.F2.02   A5E02100423
3.6  Installation
3.6.1  General installation notes
The following procedures have to be carried out before installing the device:
•  Remove all transportation safety devices and protective coverings from the device.
•  Ensure that the gaskets have the same diameter as the pipelines.
•  Note the correct flow direction for the device. This is indicated by an arrow on the housing of 
the measuring sensor.
•  On metering points with varying thermal loads, the flowmeters have to be mounted with stress 
bolts (DIN 2510).
•  Stress bolts or bolts and nuts are not included in the scope of delivery.
•  Ensure that the measuring flange is concentrically fitted.
•  Note the exact installation length of the measuring device when preparing the metering point.
CAUTION!
Installation, assembly, start-up and maintenance may only be performed by appropriately 
trained personnel. The regional occupational health and safety directives must always be 
observed.
Figure 3-10: Preparing the metering point
1  Installation length of measuring device + thickness of gaskets.
CAUTION!
The internal diameter of the pipelines, the measuring sensor and the gaskets must match. The 
gaskets may not protrude into the flow.
Figure 3-11: Internal diameter
1  Internal diameter connection pipe
2  Internal diameter flange and gasket
3  Internal diameter measuring sensor
MA_Siemens_Sitrans_FX300_R02_en_PRT.book  Page 28  Monday, June 22, 2009  8:17 AM