Thomas & Betts 9395 ユーザーズマニュアル

ページ / 74
 
 
UPS 225 - 275 kVA  
User’s and Installation Guide
1027212 
Revision B
34
NOTE Battery Aux and DC Shunt Trip wiring should be a minimum of 1.5 mm
2
.
Figure 3-10. Typical battery interface connection
3.5.3 X-Slot connections
NOTE
LAN and telephone drops for use with X-Slot cards must be provided by the customer.
NOTE
When installing internal wiring to X-Slot terminals, route the wiring through the internal
opening in the X-Slot communication bay.
For installation and setup of an X-Slot card, please contact Eaton Corporation.
To install wiring to connections:
1.   If not already installed, install the LAN and telephone drops.
2.   If not already accomplished, remove one top screw and two bottom screws securing the 
UPS center front panel (see Figure 3-1). Lift the panel straight up to remove from the panel 
hanger bracket at the top of the cabinet.
3.   Remove the UPS cabinet interface entry plates to drill or punch holes (see Figure 3-3 on 
page 26).
4.   Reinstall the interface entry plates.
5.   Route and install the LAN, telephone, and other cables to the appropriate X-Slot cards. See 
Figure 3-7 and Figure 3-11 for X-Slot location.
6.   When all wiring is complete, reinstall the front panels removed in previous steps and 
secure with the retained hardware.
7.   Refer to the manual supplied with the X-Slot card for operator instructions.