Orbit Manufacturing ORBIT 2000 ユーザーズマニュアル
Page 4 - 6
Installation
© GBC Films Group January 2001
Orbit™ 2000 Operation and Maintenance Manual
4.4 Transporting of the machine
The machine is shipped from the factory bolted to
a wooden shipping pallet/ frame.
a wooden shipping pallet/ frame.
Note the position of the machine on the pallet/
frame as illustrated to the right.
frame as illustrated to the right.
Moving the machine on the pallet/ frame
can only be accomplished with a lift truck
or a pallet wagon.
can only be accomplished with a lift truck
or a pallet wagon.
The forks of the lift truck/ pallet wagon
must be long enough to reach past the
transport supports on the farthest side
from the lift truck/ pallet wagon.
must be long enough to reach past the
transport supports on the farthest side
from the lift truck/ pallet wagon.
To remove the machine from the pallet/ frame:
– remove the shipping bolts
– drive the lift truck/ pallet wagon between the
pallet/ frame and the machine frame
– slowly raise the machine from the pallet/ frame
– Replace the shipping angle irons with the leveling
feet before final placement.
– remove the shipping bolts
– drive the lift truck/ pallet wagon between the
pallet/ frame and the machine frame
– slowly raise the machine from the pallet/ frame
– Replace the shipping angle irons with the leveling
feet before final placement.
The shift of the machine from the frame to
the floor is shown on the picture.
the floor is shown on the picture.