New Buck Corporation 81 ユーザーズマニュアル

ページ / 39
Page 13 
SECTION IV    
RESIDENTIAL FREESTANDING INSTALLATION
    
        
 
Select an installation location that will give best airflow from front of heater to  
remainder of home. 
      
 
PREPARING STOVE FOR INSTALLATION   
       
 
1.  Inspect unit for any obvious physical damage. 
 
2.  Plug power cord into a 115V AC outlet to test motor and fan. Do not run cord under unit or in high 
traffic areas. 
 
3.  Check primary air draft control to ensure that it slides freely. (See  Figure 5).   
    
 
 
4.  Remove any items from within firebox.  Spread a dropcloth on floor behind heater.  Next, tilt heater 
so that back is on drop cloth.  
 
5. (
 
Leg Kit
 
):  If  legs are to be used, obtain four legs, attach legs to holes in bottom of unit with bolts   
     and washers supplied with leg kit. (See  Figure 5).   
     
 
6. (
 
Pedestal Kit
 
): If pedestal kit is being used and (out side air is required for residential free   
    standing installation (see page 25 Out Side Air Installation). Open freestanding kit and obtain   
    stand. Place stand against bottom of heater (angle side to heater). Center stand front to rear and also  
    center stand left and right. Mark screw locations on bottom of stove through outer holes of stand  
    mounting angles. Set stand aside and drill four 7/32" holes in heater bottom. Then mount stand to  
    bottom of heater with screws provided.  (See Figure 5A).  
   
 
7.  Obtain four (4)  3/16" self-tapping screws and secure stand  to heater. 
 
8.  Reposition heater to upright position. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
FOUR NEW HOLES
 
 
 
 
Figure 5
 
Figure 5A                                                                       
 
PRIMARY AIR 
 DRAFT CONTROL 
 PEDESTAL 
HOLES FOR MOUNTING PEDESTAL