New Buck Corporation 81 ユーザーズマニュアル

ページ / 39
 
Ceiling Exit (Using Close Clearance Listed Chimney) 
 
1.  Suspend a plumb bob from the ceiling above the unit so that the weight is hanging in the 
center of  the flue exit. ( A  small weight on a string will serve as a plumb bob.)  Mark 
the  ceiling where  the  string  is suspended  to locate  the  center  of  the chimney hole. 
 
2.  After locating the center of the  hole install the  ceiling support  box, chimney or chimney 
connector, flashing and rain cap using listed  chimney only. Only use pipe listed in this 
manual. 
 
CAUTION  
 
REFER  TO  CHIMNEY MANUFACTURERS INSTRUCTIONS  FOR ASSEMBLY  AND 
DISASSEMBLY OF CHIMNEY PARTS.  BE SURE TO FOLLOW CHIMNEY INSTRUC-
TIONS FOR PROPER CLEARANCES TO COMBUSTIBLE AND PROPER AIR SPACING 
REQUIRED
.             
 
  3.  Add additional pipe until both of the following are met: 
24" min.
(610 mm)
 
OUTSIDE AIR DUCT THROUGH FLOOR WHEN 
MOBLE HOME IS NOT UNDERPENNED
RAIN CAP
FLASHING
RADIATION SHIELD
24" min.
(610 mm)
 
OUTSIDE AIR DUCT THROUGH UNDERPENNED
RAIN CAP
FLASHING
RADIATION SHIELD
36" TYP.
36" TYP.
20 FT. MAX.
27