John Deere OMGX10742 J9 ユーザーズマニュアル

ページ / 35
Assembly - 6
ASSEMBLY
Assemble Discharge Chute to Auger Housing
1. Loosen 3/8-Inch nut and lock washer (A) that holds
chute control cable assembly to the auger housing and
move cable down away from anchor mounts.
2. Insert 5/16 x 3/4-Inch carriage bolt (B) through one of
the holes in the stack (C) of the auger housing (D) with the
head of the bolt to the inside of the stack.
3. Place one stack anchor (E) onto the bolt.
4. Install 5/16-18 Nylock hex nut (F) finger tight onto bolt.
5. Install, finger tight, two other carriage bolts, stack
anchors, and Nylock nuts to the remaining two holes of the
stack.
6. Lubricate the outside of the auger housing stack (C) and
the inside of the discharge chute (G) with WD-40 or an
equivalent.
7. Install discharge chute onto the stack of the auger
housing with the discharge opening facing forward.
8. Place hook of stack anchors over the lip of the discharge
chute, push stack anchors up, pull out to seat square of
carriage bolt in hole and tighten Nylock nut at all three
stack anchors.
NOTE: Make sure top strand coming off chute control
cable assembly goes around front of discharge chute.
9. Move the chute control cable (H) up from the stack of
the auger housing onto the bottom of the discharge chute.
10.Place both loops (I) of the chute control cable over the 1/
4-Inch hex bolt and flat washer (J) on the right hand side of
the discharge chute.
11.While keeping tight pressure to the left on the chute
control cable assembly (K), remove cable tie from the
cable, slide the chute control cable assembly to the left until
cable is taut and retighten 3/8-Inch nut and lock washer (A)
assembly to secure chute control cable assembly.
12.To obtain optimum clearance and chute rotation
proceed as follows:
Make sure discharge chute is lubricated. (See
Lubricating Discharge Chute in Service section.)
A
M95940
M95939
B
G
D
E
F
C
H
A
M95940
I
J
K
D
M95941
M
L