Honeywell VCR DCP200 ユーザーズマニュアル

ページ / 184
DCP200 Profile Controller & Recorder - Product Manual
51-52-25-150, Issue 1 – April 2009
Installation
Page 15
2 Installation
Unpacking
1. Remove the product from its packing. Retain the packing for future use, in case it is 
necessary to transport the instrument to a different site or to return it to the supplier for 
repair/testing.
2. The instrument is supplied with a panel gasket and push-fit fixing strap. Concise manual(s)
are supplied with the instrument, in one or more languages. Examine the delivered items 
for damage or defects.  If any are found, contact your supplier immediately.
Installation
CAUTION:
Installation should only be performed by technically competent personnel. It is the 
responsibility of the installing engineer to ensure that the configuration is safe. 
Local Regulations regarding electrical installation & safety must be observed (e.g. 
US National Electrical Code (NEC) or Canadian Electrical Code).
Figure 1. Main dimensions
Panel-Mounting
The mounting panel must be rigid and may be up to 6.0mm (0.25 inches) thick. The cut-out 
size is:
92mm x 92mm (+0.5mm / -0.0mm).