Henny Penny 6 ユーザーズマニュアル

ページ / 9
59
Installation
Refer to the following pages for important information regarding the
installation of LCS and LCG ClimaPlus Combis. It is recommended 
that installation be accomplished by a certified and properly trained 
technician.
NOTE: When installing a ClimaPlus combi, humidity calibration must
be performed. This process takes approximately 45-60 minutes. (page 62)
Site, leveling
1) Check for any transport damages. Should there be any signs of transport 
damage immediately inform your dealer/freight forwarder.
2) Check installation site. Check entrance clearance.
Minimum entrance space needed without pallet: 
Model 6 & 10:
35
1
2
in. (902 mm)
Model 1020:
49
5
8
in. (1262 mm)
Model 20:
39
7
8
in. (1012 mm)
Model 40:
52
1
2
in. (1332 mm) 
Floor at installation site must be level. 
Cold water line in place. (page 63)
2 in. (50 mm) drain connection installed.
Max. drain height for floor units: 4 in. (100mm)
Electrical power supply/protective measures installed and sized correctly. 
(page 60-61) 
3) Remove all cartons, packing materials, documents etc. from the interior cabinet.
4) Remove grid shelves/trolley from cabinet.
5) Take unit off the pallet.
Moving unit without pallet: Sizes 6, 10, 1020 (Fig. 1)
Moving unit without pallet: Sizes 20, 40 (Fig. 2)
Minimum clearance sides and back:
2 in. (50 mm)
Service clearance, left side:
20 in. (500 mm)
Clearance for door opening:
Model 6 & 10:
20
1
2
in. (521 mm)
Model 1020:
29
1
2
in. (749 mm)
Model 20:
28
3
4
in. (730 mm)
Model 40:
30
3
4
in. (781 mm)
Fig. 1
Fig. 2