bolts in the concrete.  Sleeve anchors should be used to secure the operator to the 
pad. This allows greater flexibility in positioning the operator on the pad. 
4.  Allow the pad to cure for 48 hours before removing the forms or mounting the operator. 
5.  Once the pad has cured, place the operator / mounting plate on the pad in the proper 
position; 4-inches from the front and sides of the pad and 1-inch from the rear of the pad.    
The operator mounting plate must be parallel to the gate.  CAUTION: the operator 
is heavy.  Two persons are required to lift the operator onto the mounting pad.
 
6.  Once the operator is in the proper position on the pad, secure the operator mounting 
plate directly to the pad using 3/8 or 1/2 x 3 sleeve anchors. Be sure that the operator 
mounting plate is parallel to the gate
 