 INSTALLATION 
INSTRUCTIONS 
 FORCED 
DRAFT 
 
STEAM BOILERS
 
                                                                                                                                          
 
NOTE:
 
•  Please read all of instruction manual before attempting installation. 
•  Insurance and local or state regulatory codes may contain additional or more stringent requirements 
than those contained in this manual. Installation must conform to these codes and any other 
authority having jurisdiction. 
                                                                                                                                             
1.1 BOILER FOUNDATION
 
 
Before uncrating, the boiler location should be 
prepared. The boiler should set upon a good level 
concrete floor. If the boiler is not level or the floor 
in good condition, a concrete foundation should 
be built, the dimensions larger than the outside 
dimensions of the boiler base. 
 
DO NOT INSTALL BOILER ON COMBUSTIBLE 
FLOORING. The only exception to this is UL 
Labeled F -Series boilers which may be installed 
on combustible flooring. 
                                                                  
IMPORTANT
 
If the boiler is installed directly on a concrete floor 
where it is important that the floor be kept cool 
(such as an upper floor or mezzanine or when 
sitting over wiring conduits) set the boiler up on 
insulating tile or steel framework so that air may 
circulate underneath. For atmospheric gas fired 
boilers, it is advisable to build up an insulating 
floor under the boiler using high temperature 
mineral fiber board at least 1 1/2" thick. 
                                                                  
1.2 CLEARANCES
 
 
See Table 1 for minimum clearances to wall, 
ceilings, or obstructions. The clearances in Table 
1 are intended as a general recommendation 
only. Local codes must be applied to specific 
installations and the minimum clearances 
established accordingly. Provisions must also be 
made for service, accessibility and clearance for 
piping and electrical connections. 
 
Do not obstruct combustion air and ventilation 
openings with piping or any other construction. All  
boilers must be installed in a space which is 
large, compared to the boiler. Only UL Labeled F-
Series boilers are suitable for installation on 
combustible flooring. 
 
                                                                  
NOTE
 
ADHERE TO ALL APPLICABLE LOCAL CODES 
REGARDING BOILER INSTALLATION AND 
CLEARANCES. 
                                                                  
1.3 UNCRATING THE BOILER
 
 
Uncrate the boiler near its permanent location. 
Leave it on the bottom crating until ready to place 
permanently. Leave the plastic shroud on the 
boiler until all piping work is complete, cutting 
holes in the plastic for access to connections. 
 
Remove the bolts attaching the boiler to the crate 
at the underside of the bottom crating. Lift or slide 
the boiler off of the bottom crating into position. 
Be careful not to tip the boiler up on one corner or 
side, which could cause damage to jacket.