Precision Trading 60 R3.0 ユーザーズマニュアル

ページ / 62
Operator Manual, Supercharger 60 
R3.0 
 
Page 62 of 62 
14. REVISION 
INDEX 
Table 2 - Index of Revisions 
REVISION 
DATE  
NOTES
 
1.0 
21 January 2001 
Release 
2.0 
15 January 2003 
New Clock-Timer Board and additional Peak function 
2.1 23 
July 
2003 
Overvoltage is now set at 1.75V/cell (was 1.70). Numerous other text 
updates (clarifications). 
3.0 4 
October 
2007  Reformatted 
Many text changes for clarification