New Buck Corporation 18 ユーザーズマニュアル

ページ / 43
FINAL CHECK 
 
1.  Recheck the specified clearances. 
 
2.  Remove all foreign material from the firebox area. 
 
3.  Open the primary air draft. 
 
NOTE:  Plug the power cord into a 115 VAC outlet.  Route the cord to prevent damage to the 
cord insulation from heat and sharp objects.  Keep the cord out of the way of traffic to  prevent 
damage caused by tripping, etc.  
 
4.  Place crumpled pieces of newspaper in the stove.   Light  it and  close  the  doors.  Ensure 
that  the  stove  draws  properly through the primary draft. 
 
5.  Check for smoke leaks around the doors. 
 
CAUTION 
 
Open the doors and check for smoke escaping from the front of the stove. 
Smoking  usually indicates a defective or  poorly  positioned  chimney.   Some  chimneys 
with a marginal  draft  can  be preheated  by  lighting newspaper and holding 
it  near  the  open damper  with a poker or fire tong.  Once the chimney heats up,  a 
proper draft can usually be obtained. 
 
If a thorough review of the Troubleshooting Guide in the rear  of the  manual does not reveal 
the problem, contact your dealer  for assistance. 
 
 
CAUTION 
 
The unit is painted with a specially formulated high  temperature paint that cures during 
the first two or three firings.  You  may notice a slight smoking effect and an odor of 
burning paint  when you build the first fires.  This is normal and is not a cause for alarm. 
In some cases, these fumes will activate a smoke  alarm.  Opening a window near the unit 
will allow these fumes to escape.  DO NOT build a large roaring fire until this curing 
is  complete or the heater finish may be damaged. 
24