Vogelzang International Defender High Efficiency Air-Tight Woodstove TR001 ユーザーズマニュアル

ページ / 19
VGZ-026 / 052705.0
TR001 DEFENDER™
 / 
Page 17
FLOOR PROTECTOR MATERIAL CALCULATIONS
This stove has been tested for and must be installed on a floor protector with the proper Thermal
Resistance or R-value as stated in the installation instructions on page 3, “Locating Stove” step 1, of
this manual. If the floor protector materials listed in the instructions are not available, materials with an
equivalent R-value may be substituted.
Alternate materials may be rated with C-factor (Thermal Conductance) or k-factor (Thermal Con-
ductivity) ratings which must be converted to R-value to determine if the alternate material meets the
tested requirements. The following instructions provide the proper information and formulas for con-
version to R-value.
To determine if alternate materials are acceptable follow this sequence.
1. Convert material specifications to R-value:
a. R-value given — no conversion necessary
b. k-factor is given with a required thickness (T) in inches:
R = 1/k x T
c. C-factor is given: R = 1/C
2. Determine the R-value of proposed alternate floor protector:
a. Use formulas in step 1 above to calculate R-value of proposed material(s).
b. For multiple layers, add R-values of each layer to determine overall R-value.
3. If the overall R-value of the floor protector system is equal to or greater than the floor protector
specifications given, the alternate is acceptable.
Definitions:
Thermal conductance (C) =
BTU
=
W
(hr)(ft
2
)(
°
F)
(m
2
)(
°
K)
Thermal conductivity (k) =
(Btu)(inch)
=
W
=
Btu
(hr)(ft
2
)(
°
F)
(m)(
°
K)
(hr)(ft)(
°
F)
Thermal resistance (R) =
(ft
2
)(hr)(
°
F)
=
(m
2
)(
°
K)
Btu
W
Example:
The specs of floor protector material should be 3/4-inch thick material with a k-factor of 0.84.
The proposed alternative material is 4” brick with a C-factor of 1.25 over 1/8-inch mineral board
with a k-factor of 0.29.
Step 1: Convert specs to R-value.
R = 1/k x T = 1/0.84 x 0.75 = 0.893   System must have a R-value of 0.893 = Rspecs
Step 2: Calculate R-value of individual components
4” Brick with C-factor = 1.25.  R = 1/C = 1/1.25 = 0.80 = Rbrick
1/8-inch (0.125”) mineral board with k-factor = 0.29. R = 1/0.29 x 0.125 = 0.431 = Rmin.brd.
Step 3: Add R-values of components to get total R-value of system
Rbrick + Rmin.brd = 0.80 + 0.431 = 1.231 = Rsystem
Step 4: Compare Rsystem to Rspecs
Rsystem = 1.231 is larger than Rspecs of 0.893. System R-value exceeds  the required
specifications and therefore is an acceptable alternative.