Vogelzang International Defender High Efficiency Air-Tight Woodstove TR001 ユーザーズマニュアル

ページ / 19
VGZ-026 / 052705.1 
TR001 DEFENDER™
 / 
Page 3
ASSEMBLY INSTRUCTIONS
TOOLS
TOOLS AND MATERIALS REQUIRED FOR INSTALLATION
•   Pencil
• 6 foot Folding Rule or Tape Measure
• Tin Snips
• Drill: Hand or Electric
• 1/8” dia. Drill Bit (for sheet metal screws)
• Screwdrivers (blade and Phillips type)
• 14mm Nut Driver or Ratchet with 14mm Socket
• Safety Glasses
• Gloves
MATERIALS
(NOTE: The following items are NOT included with your stove)
Flooring Protection: 35” x 41” as specified (see page 4)
Chimney Connection Pipe: 6” black steel (24 ga. min.) straight
stove pipe or elbow (as required)
1/2” Sheet Metal Screws
Chimney: Existing 6” Lined Masonry Chimney or 6” Inside Dia.
Listed Type HT chimney.
Furnace Cement (manufacturer recommends Rutland Code 78
or equivalent)
CAUTION: STOVE IS HEAVY. MAKE SURE YOU
HAVE ADEQUATE HELP AND USE PROPER
LIFTING TECHNIQUES WHENEVER MOVING
STOVE.
1. Uncrate the stove and remove cardboard pack-
ing and protective poly bag.
2. Remove four (4) legs and hardware pack from
inside stove. NOTE: Stove may be lightened
during installation by removing fire brick. Re-
place firebrick before using. There are three
different sizes brick. Note the location of each
while removing or refer to illustration 1 for
proper location inside firebox.
3. Place flattened carton on floor and lay the stove
on it’s back.
4. Remove the four 14mm nuts from the threaded
studs located on each corner (total of 16).
5. Place leg in position and secure using the nuts
removed in step #4. Tighten nuts securely.
6. Carefully lift the stove into an upright posi-
tion.
7. Cut and remove wire tie holding “Z” bar in
place. The “Z” bar is located at the top front
inside of stove. The plastic wire tie is for ship-
ping purposes only.
8. Level stove with adjustable glides on bottom
of legs.
Optional Blower Attachment
(not included with stove)
1. Attach blower assembly (#3) to back of rear
deflector. NOTE: Make sure ceramic gasket is
positioned between rear deflector heat shield
and blower assembly. Use four screws provided
to fasten the blower to rear heat shield.
2. Route the power cord away from stove. Do not
allow the power cord to touch any hot surfaces.
Keep power cord at least 12˝ from stove sur-
faces.
3. Once stove is positioned, plug power cord into
a grounded 120v outlet.
1. The stove must be placed on solid concrete,
solid masonry, or when installed on a combus-
tible floor, on a listed floor protector, such as
Hy-C or Imperial Model UL 3648BK or
equivalent with 0.08 R factor. (NOTE: to cal-
culate R-value of alternative materials see page
17). The base must extend at least 18” beyond
the front of the access door, 8” to the sides of
fuel opening, and must  extend under and 2
inches beyond either side of the stove pipe if it
is elbowed towards a wall. (See figures 1 & 3
and consult local building codes and fire pro-
tection ordinances). A grouted ceramic floor
tile installed per local building code is consid-
ered a durable equivalent.
CAUTION: (FIRE HAZARD) CARPETING AND
OTHER COMBUSTIBLE MATERIAL SHALL NOT
COVER THE FLOOR PROTECTOR. THESE
MATERIALS MUST REMAIN OUTSIDE OF
COMBUSTIBLE CLEARANCES, SEE FIG. 1 – 3.
2. The stove must have its own flue. DO NOT
CONNECT THIS UNIT TO A CHIMNEY
FLUE SERVING OTHER APPLIANCES.
3. After observing the clearances to combustible
materials (figures 1–3), locate your floor
protector accordingly (figure 1) and carefully
place the stove in your selected location.
Install stove pipe, elbows, and thimble as
required, utilizing either a recently cleaned and
inspected 6”  masonry chimney or a 6” i.d.
listed chimney.
LOCATING STOVE
Continued on next page
NOTICE: Vogelzang International Corp. grants no warranty, stated or implied, for the installation or maintenance
of  your wood stove and assumes no responsibility of any incidental or consequential damages.