Electrolux OHV ユーザーズマニュアル

ページ / 52
8
9
CONSUMER
 
ASSEMBLY / PRE-OPERATION
INSTALL AUGER CONTROL ROD (See Figs. 5 and 6)
The auger control rod has the short loop on the end of the 
spring as shown.
1.    Slide rubber sleeve up rod and hook end of spring into 
control arm with loop opening up as shown.
2.    Remove retainer spring from top end of rod.
3.    With top end of rod positioned under right side of control 
panel, push down on rod and insert end of rod into hole 
in auger control bracket.  Secure with retainer spring.
INSTALL DISCHARGE CHUTE / CHUTE ROTATER HEAD 
(See Fig. 7)
NOTE:
 The multi-wrench provided in your parts bag may 
be used to install the chute rotater head.
1.    Place discharge chute assembly on top of chute base 
with discharge opening toward front of snow thrower.
2.    Position chute rotater head over chute bracket.  If nec-
essary, rotate chute assembly to align square and pin 
on underside of chute rotater head with holes in chute 
bracket.
3.    With  chute  rotater  head  and  chute  bracket  aligned, 
position chute rotater head on pin and threaded stud 
of mounting bracket.
4.    Install 3/8 washer and locknut on threaded stud and 
tighten securely.
TRACTION 
DRIVE CON-
TROL ROD
DRIVE
CONTROL 
BRACKET
RETAINER 
SPRING
TRACTION DRIVE 
CONTROL LEVER
AUGER
CONTROL 
LEVER
AUGER
CONTROL 
ROD
AUGER
CONTROL 
BRACKET
RETAINER 
SPRING
FIG. 4
FIG. 6
AUGER CON-
TROL ROD
CONTROL 
ARM
RUBBER 
SLEEVE
LOOP 
OPENING 
UP
FIG. 5
CHUTE RO-
TATER HEAD
3/8 WASHER
3/8 LOCKNUT
THREADED  
STUD
PIN
ROTATER HEAD 
MOUNTING 
BRACKET
CHUTE 
BRACKET
FIG. 7
For Husqvarna Parts Call 606-678-9623 or 606-561-4983
www.mymowerparts.com