Cuno SQC Series ユーザーズマニュアル

ページ / 17
1
Push in grey collet to release tubing.
2
Tubing is secured in.
Grey Collet 
Tube
O-Ring
Push tubing straight in as far as it will go.
1
Pull tubing straight out.
2
To Attach Tubing 
To Release Tubing 
This product is outfitted with user friendly ‘Push In’ connectors. Proper use of the
connectors is shown in the diagrams.
It is most important that the tubing selected for use with these connectors be of
high quality, exact size and roundness, and with no surface nicks or scratches. If it is
necessary to cut the tubing, use a plastic tubing cutter or sharp razor knife. Make a
clean square cut. 
Should a leak occur at a ‘Push-In’ connector, the cause is usually defective tubing. 
To Fix:
• Relieve pressure
• Release tubing
• Cut off at least 1/4” from end.
• Reattach tubing
• Confirm connection is leak free.
‘Push-In’ Tubing Connector
Fig. 6
9
M. FLUSH THE APPLIANCE OF THE PRESERVATIVE 
AND CHECK THE OPERATION
1)
With the tank valve closed (the tank should still contain the 
sanitizing solution at this point), open the faucet (set the 
faucet handle in the "up" position) and feed water valve.  
Water should begin to drip from the faucet within several 
minutes. Continue to flush the system for 1 hour.  Water 
will steadily drip from the faucet at this time.  During this 
procedure, the tank is being intentionally bypassed in 
order to thoroughly sanitize the tank and also flush the 
membrane of any preservatives.
2)
After flushing for 1 hour, shut off the faucet. Open the tank 
valve, lift the faucet handle again and allow the tank to 
completely empty. When the tank is empty, the faucet will 
drip steadily.  Measure and record the rate at which water 
drips from the faucet.  Use a graduated cylinder (in 
milliliters) and a watch with a second hand to calculate the 
approximate production in gallons per day (milliliters per 
minute x 0.38 = gpd). Proceed to check the reject flow by 
disconnecting the tubing at the drain connection and 
measuring the drip rate as outlined above. The ratio 
should be a minimum of 2.5 (reject) to 1 (product).  
Repeat every 5 minutes until the rate is constant.  When 
the rate is constant, the tank is empty.
3)
Allow the system to operate in this condition for 24 hours 
to ensure water purity.
4)
Close the faucet and reinspect the appliance for leaks. 
Allow the tank to fill completely  (it will take approximately 
4 hours), then drain the tank again.  The water should be 
discarded 
because it may contain some preservative/
disinfectant solution.
5)
The appliance should be ready to use as soon as the tank 
refills.  If any objectionable taste is noticed after the 
second tankful is drained, instruct the customer to wait 
and drain the tank the following day.  Only at this time 
should an icemaker be turned on if one is connected to 
the appliance.
NOTE: If an optional percent rejection (PR) monitor is used
and the red light is on, service is required.  Several tankfuls of
water may have to be used to completely flush the excess TDS
from the new carbon postfilter before a green light will show.
N. CLEAN UP AND PAPERWORK
1)
Clean up the work area thoroughly.
2)
Fill out the warranty card and return it.
For replacement parts and filters, please contact your dealer or
call Water Factory Systems at 1-800-733-1199 or visit our
website at www.waterfactorysystems.com.