Bunn FPG-2 ユーザーズマニュアル

ページ / 79
31
SERVICE (Cont.)
Circuit Breaker (Models LPG, LPG-2E, FPG, FPG-2 DBC)
P1036
FIG. 22 CIRCUIT BREAKER
P1037
FIG. 23 CIRCUIT BREAKER TERMINALS
RED from Motor-LPG-2E
BLK from Start Switch-LPG
BLK from Power Cord
Removal and Replacement:
1.  Remove the wires from the circuit breaker.
2.  Remove the face nut securing circuit breaker to the 
motor support.
3.  Remove circuit breaker.
4.  Install new circuit breaker in motor support and 
secure with face nut.
5.  Reconnect the wires.
6.  Refer to FIG. 23 when reconnecting the wires.
Location:
  The circuit breaker is located on the rear of the 
grinder next to the power cord strain relief bushing. The 
circuit breaker is not available on Model LPG equipped 
with capacitor.
Test Procedure:
1.  Disconnect grinder from the power source.
2.  Remove the wires from the circuit breaker.
3.  Check for continuity between the terminals. Conti-
nuity must be present between the terminals.
If continuity is present as described the circuit breaker 
is functioning properly.
If continuity is not present as described, press reset 
button and repeat step #3, if continuity is not present 
as described, replace the circuit breaker.
41545 122209