Bradford-White Corp BRUTE DELUXE BMT2V ユーザーズマニュアル

ページ / 44
Brute Deluxe 
(200, 300, 400)
Page 25
Figure 14. Field Wiring.
5.2 Field Wiring
Field Installed Pump: A pump contactor can be 
wired to the “2” and “4” terminals on the pump time 
delay relay, attached to dry contacts of an adjustable 
delay. The contacts may be used to switch a larger 
pump contactor or can be used to directly switch the 
hot leg of a circulator pump, up to 1 hp at 120 VAC or 
3/4 hp at 240 VAC.
Note that in some cases, the pump is run 
continuously by switching the pump status switch 
position to "constant".
Note terminals “2” and “4” are located on the 
time delay relay, which is mounted to the bottom of 
the control panel tray and accessed when the tray is 
swiveled to the "up" position.
To connect the pump, crimp the two spade 
connectors to the black (hot) and white (neutral) pump 
wires (as shown in pump diagram, 
Figure 14
). The 
other end of the pump wired needs to be connected 
to the boiler's 110V legs using the existing wire nuts 
(located in the transformer cover box). Also note 
the transformer cover box is removed by lifting the 
retaining tab (on the left side of the box) up and out of 
the retaining slot, and sliding the box to the left until it 
stops, before raising it straight up.
Other Field Interlocks: To install other field-
wired switches (proving switches, flow switches, etc.), 
remove the jumper between the terminals labeled “3” 
and “4” (
see Figure 13
)