Bradford-White Corp BRUTE DELUXE BMT2V ユーザーズマニュアル

ページ / 44
Brute Deluxe 
(200, 300, 400)
Page 29
SECTION 6.
Operating Instructions
6.1  Filling the Boiler System
1.  Ensure the system is fully connected. Close all 
bleeding devices and open make-up water valve. 
Allow system to fill slowly.
2.  If make-up water pump is employed, adjust 
pressure switch on pumping system to provide 
a minimum of 12 psi (81.8 kPa) at the highest 
point in the heating loop.
3.  If a water pressure regulator is provided on the 
make-up water line, adjust the pressure regulator 
to provide at least 12 psi (81.8 kPa) at the highest 
point in the heating loop.
4.  Open bleeding devices on all radiation units 
at the high points in the piping throughout 
the system, unless automatic air bleeders are 
provided at such points.
5.  Run system circulating pump for a minimum of 
30 minutes with the boiler shut off.
6.  Open all strainers in the circulating system, 
check flow switch operation, and check for 
debris. If debris is present, clean out to ensure 
proper circulation.
7.  Recheck all air bleeders as described in Step 4.
8.  Check liquid level in expansion tank. With the 
system full of water and under normal operating 
pressure, the level of water in the expansion tank 
should not exceed ¼ of the total, with the balance 
filled with air.
9.  Start up boiler according to the procedure in this 
manual. Operate the entire system, including the 
pump, boiler, and radiation units for one (1) hour.
10.  Recheck the water level in the expansion tank. If 
the water level exceeds ¼ of the volume of the 
expansion tank, open the tank drain, and drain to 
that level.
11.  Shut down the entire system and vent all 
radiation units and high points in the system 
piping, as described in Step 4.
12.  Close make-up water valve and check strainer in 
pressure reducing valve for sediment or debris 
from the make-up water line. Reopen make-up 
water valve.
13.  Check gauge for correct water pressure and also 
check water level in the system. If the height 
indicated above the boiler insures that water is at 
the highest point in the circulating loop, then the 
system is ready for operation.
14.  Refer to local codes and the make-up water 
valve manufacturer’s instructions as to whether 
the make-up water valve should be left open or 
closed.
15.  After placing the unit in operation, the ignition 
system safety shutoff device must be tested. 
First, shut off the manual gas valve, and call 
the unit for heat. After the pre-purge and ignitor 
heat-up time, the main gas terminals will be 
energized, attempting to light, for seven (7) 
seconds, and then will de-energize. The unit will 
attempt to light two more times, and then will go 
into lockout mode. Second, turn the power off 
and then on again, open the manual gas valve 
and allow the unit to light. While the unit is 
operating, close the manual gas valve and ensure 
that power to the main gas valve has been cut.
16.  Within three (3) days of start-up, recheck all air 
bleeders and the expansion tank as described in 
Steps 4 and 8 above.
Important: The installer is responsible for identifying 
to the owner/operator the location of all emergency 
shutoff devices.
   WARNING
Do not use this appliance if any part has been 
under water. Immediately call a qualified service 
technician to inspect the appliance and to replace 
any part of the control system and any gas control 
that may have been under water.
 AVERTISSEMENT
N’utilisez pas cet appareil si l’une de ses pièces est 
passée sous l’eau. Appelez tout de suite un technicien 
en entretien et en réparation pour inspection de 
l’appareil et remplacement des pièces du système de 
commande, et des pièces de commande du circuit 
gaz, qui sont passées sous l’eau.
6.2  Operating Temperature Control
(Note: BMT2 may be ordered with either an on/
off or 2-stage aquastat.)
To utilize the boiler's on-board controller, be sure 
to have the “Local/Remote” selector switch to “Local”. 
Set the controller to the desired operating set point. 
The controller has an interstage differential that can be 
adjusted from 3°F to 10°F. This allows the user to have 
some control over how stage 2 and stage 1 call for heat 
(
see Figure 19
).
Because the Brute Deluxe controller senses inlet 
water and the manual reset high limit senses outlet 
water, the high limit should be set 40-50°F higher than 
the controller, to avoid nuisance lockout of the manual 
reset high limit.
6.3  External Boiler Operations
If controlling the stages of the BMT2 from an 
external source (multiple boiler control, BAS, etc) the 
“Local/Remote” selector switch above the terminal 
strip must be placed in the “Remote” position. In this 
mode, the controller that is mounted on the BMT2 
will no longer have control of the unit. The 24V from 
the unit waits at the input terminal, and the external