Zephyr CTPE48BSX オーナーマニュアル

ページ / 50
Installation – 
Mounting Height & Clearance
6
www.zephyronline.com
DUCTING
A minimum of 6” round duct work must be used to 
maintain maximum air fl ow effi ciency with the 290/600 
cfm internal blower.  A minimum of 10” to 8” round duct 
work must be used with the 1000 cfm remote blower.
Always use rigid type metal ducts only. Flexible ducts 
could restrict air fl ow by up to 50%.
Use calculation (on page 5) to compute total available 
duct run when using elbows, transitions and caps.
ALWAYS, when possible, reduce the number or 
transitions and turns. If long duct run is required, 
increase the duct size.. If a reducer is used, install a 
long reducer instead of a pancake reducer. Reduce 
duct size as far away from opening as possible.
If turns or transitions are required; install as far 
away from opening and as far apart, between 2, as 
possible.
Minimum mount height between range top and hood 
bottom should be no less than 26”. 
Maximum mount height should be no higher than 36”.
It is important to install the hood at the proper 
mounting height. Hoods mounted too low could 
result in heat damage and fi re hazard; while hoods 
mounted too high will be hard to reach and will lose 
its performance and effi ciency.
If available, also refer to range manufacturer’s height 
clearance requirements and recommended hood 
mounting height above range. 
 
Vertical Ducting:
6” round minimum (internal blower)
10” to 8” round minimum (remote blower)
Horizontal Ducting:
N/A
DAMAGE-SHIPMENT / INSTALLATION:
•  Please fully inspect unit for damage before 
installation.
•  If the unit is damaged in shipment, return the unit 
to the store in which it was bought for repair or 
replacement.
•  If the unit is damaged by the customer, repair or 
replacement is the responsibility of the customer.
•  If the unit is damaged by the installer (if other 
than the customer), repair of replacement must 
be made by arrangement between customer and 
installer.
min.  A
max. B
    
 
 
 
Standard  
     Extension
Hood Heights  
 
Duct Cover 
     Duct Cove
r
                          minimum (A)  34” 
 
           47“
                          maximum (B)  51 
1/2
”   
           72”
Ceiling Heights
                          minimum (C)  96” (8’)                           109“ (9‘ 1”)
                          maximum (D)  123 
1/2
” (10’ 3 
1/2
“)     144” (12’)
36”
26” min.
36” max.
min.  C
max. D