Zephyr COKE36BSX マニュアル

ページ / 23
12
www.zephyronline.com
gap between
bracket and
wall
Top
Bottom
1.  Measure from cooking surface to desired hood bottom, level and mark line A. (28” minumum from cooking 
surface)
2.  Plum and mark center line.
3.  Mark line B, 9-11/16” up from line A. This is the top position of the wall bracket. FIG. 1
4.  Follow center line up to the ceiling, measure and mark ceiling bracket mount line C, 6” out from the wall 
onto the ceiling. FIG. 2
5.  Mark ceiling bracket mounting spread, 8-11/16” from center line on line C. FIG. 2
6.  Place duct cover ceiling bracket onto ceiling and mark inside diameter of ceiling bracket. Cut inside 
diameter of ceiling bracket to fi t the 6” or 8” round duct pipe. 
7.  Prepair duct work and electrical through ceiling. 
8.  Attach ceiling bracket to ceiling by (2) M4 * 1-1/2” screws. Wood blocking may need to be added inside 
ceiling to support the weight of the upper duct cover. 
9.  Place and center the top of wall bracket on line B. The top of the wall bracket will have a gap between the 
bracket and the wall. FIG. 3
A
min.  28”
max. 36”
C/L
14-1/2”
9-11/16”
B
C/L
Installation – 
Mounting the Range Hood
CAUTION: At least two installers are
required due to the weight and size of the
hood.
!
6”
C/L
8-11/16”
C
FIG. 1
FIG. 3
FIG. 2