Zephyr AK2100BS オーナーマニュアル

ページ / 72
16
www.zephyronline.com
Installation – 
Mounting the Range Hood
 
 3UHSDUHGXFWORFDWLRQRQKRRG YHUWLFDORU
KRUL]RQWDO 5HIHUWR3DJHVIRUGXFWLQJ
options.
2.  Measure and cut out duct and electrical 
openings in cabinet or wall to match up with 
the hood.  Ducting and electrical dimensions 
can be found on Pages 10-12.  Note: Make 
sure duct opening is large enough to apply 
aluminum duct tape.
3.   Reinforce cabinet bottom with wood strips 
if additional strengthening is required or if 
cabinets are framed.
4.  Remove bottom panel from hood using a 
Philips head screwdriver to remove each of 
the screws.  Also disconnect lighting harness 
by pressing in on the clip to release the lights 
from the internal wiring.
 ,QVWDOO  ZRRGVFUHZVWRFDELQHWERWWRP
by following the installation screw hole 
dimensions on Page 10.  These screws will be 
used to secure the hood to the cabinet.  
6.  Lift hood onto screws located on cabinet 
bottom and lock into place.  Make sure all 
 NH\KROHVFRYHUWKHVFUHZV7LJKWHQHDFK
screw to secure hood to cabinet. Note: For 
30” Typhoon models you will need an 8” - 10” 
long shaft for your screwdriver/drill to reach the 
front screws.
7. Install 
electrical.
8.  Install duct work and seal with aluminum duct 
tape.
9.  Power up hood and check for leaks around 
duct tape and test all functions.
10. Reinstall bottom panel and re-connect lighting 
harness.
11. Slide residue cups into their openings on the 
bottom of the hood.  Install safety grilles over 
each blower opening and secure with the two 
safety grille screws.
Hood is designed for installation under a 
kitchen cabinet. See Fig. 1 for details.
bottom panel & 
lighting harness
wood blocking
installation screws
and key-holes
duct work
residue cups &
safety grilles
electrical
duct tape
Fig 1