Zephyr ZMLE42B 入門ガイド

ページ / 21
10
www.zephyronline.com
Installation – 
Mounting the Hood
5.  Remove tape securing electronics mounting bracket to hood. (FIG. D, #1)  Remove (3) screws from top of hood 
body and set screws aside.  Position electronics mounting bracket as show in (FIG. D, #2) and secure to hood body 
using the (3) previously removed screws.
6.  Remove stainless steel mesh filters from hood.  Place canopy over blower housing located on top of hood and 
secure it to hood body using (4) 3/16” x 8 screws through fi lter opening. (FIG E)
7.  Lift hood body and align the (4) pre-installed mounting screws on top of blower housing (FIG. A, #5 on Page 9) with 
the (4) key holes on the bottom of the support frame. (FIG. F)  Slide hood towards the narrow end of key holes to lock 
in place.  Hand tighten each of the (4) screws to secure hood to bottom of support frame. Install (1) M4 x 12mm safety 
screw into bottom support frame to further secure the hood. (FIG. F, #1) Reinstall mesh fi lters.
8.  Install electrical and duct work. Seal duct work with aluminum duct tape.
9.  Power up hood, verify all functions and check for leaks around duct tape.
FIG. D
ELECTRONICS 
MOUNTING 
BRACKET
FIG. E
1
2
BLOWER
HOUSING
FIG. F
1
CAUTION: At least two installers are
required due to the weight and size of the
hood.
!