Napoleon EF39X オーナーマニュアル

ページ / 40
W415-0924 / C / 09.28.12
2  
EN
NOTE: Changes, other than editorial, are denoted by a vertical line in the margin.
TABLE OF CONTENTS
1.0 INTRODUCTION 
3
1.1 DIMENSIONS 
4
1.2 LISTING 
APPROVALS 
4
1.3 GENERAL 
INSTRUCTIONS 
5
2.0 LOCATING 
APPLIANCE 
6
2.1 
UNPACKING AND TESTING APPLIANCE 
6
2.2 GROUNDING 
APPLIANCE 
6
3.0 INSTALLATION 
8
3.1 
WALL MOUNT INSTALLATION 
8
3.1.1 
MINIMUM MANTEL CLEARANCES 
8
3.1.2 
MINIMUM CLEARANCE TO COMBUSTIBLES 
9
3.1.3 INSTALLING 
THE 
APPLIANCE 
9
3.2 RECESSED 
INSTALLATION 
10
3.2.1 
MINIMUM CLEARANCE TO COMBUSTIBLES 
10
3.2.2 FRAMING 
10
4.0 FINISHING 
11
4.1 
GLASS EMBER INSTALLATION 
11
4.2 
GLASS FRONT INSTALLATION 
11
5.0 OPERATING 
INSTRUCTIONS 
12
5.1 
MAIN POWER SWITCH 
12
5.2 
OPERATING BY REMOTE CONTROL 
12
6.0 MAINTENANCE 
13
6.1 
REPLACING THE FLAME GENERATION LIGHT BULBS 
14
6.2 
REPLACING THE EMBER BED LIGHT BULBS 
15
6.3 
HARD WIRE INSTALLATION 
16
7.0 REPLACEMENT 
PARTS 
17
8.0 TROUBLESHOOTING 
18
9.0 WARRANTY 
19