Zephyr AK7100AS290 入門ガイド

ページ / 22
Installation – 
Preparing Duct Location
10
www.zephyronline.com
Note: If using hood in recirculating mode skip these steps and turn to page 11.
Vertical Ducting
(7" Round)
  Vertical Ducting
(3-1/4"x10" Rectangular)
1.  Using  a  fl at-head  screwdriver,  remove  both  the         
    rectangular and round knock-out plates located on     
    top of hood
1. Using a fl at-head screwdriver, remove only the  
    rectangular section of the knock-out plate located   
    on top of hood.
1. Using a fl at-head screwdriver, remove the 
    rectangular knock-out plate located on back of 
    hood.
2. Secure 3-1/4" x 10" rectangular collar to top of 
    hood using (6) M4 x 8 screws.
2. Secure 3-1/4" x 10" rectangular collar to back of 
    hood using (6) M4 x 8 screws.
2. Secure 7" round collar to top of hood using
    (6) M4 x 8 screws.
  Horizontal Ducting
(3-1/4"x10" Rectangular)
1
6
2
5
3
4
1
6
2
5
3
4
1
6
2
5
3
4