Capital MWOV302ES インストール手順

ページ / 16
 
- 10 - 
ELECTRICAL WIRING INSTALLATION (continued) 
d.  Connect the appliance Red L2 wire to the household Red L2 wire from the junction box. 
2.  Three Wire Connection with External Ground – Must be permitted by local codes 
a.  Each wire must be individually connected to the household supply wire. 
b.  Connect the appliance Black L1 wire to the household Black L1 wire from the junction box. 
c.  Connect the appliance White Neutral wire to the household White neutral wire from the junction 
box. 
d.  Connect the appliance Red L2 wire to the household Red L2 wire from the junction box. 
e.  Connect the Green appliance ground wire to an approved external ground source, such as a cold 
water pipe. (All ground sources must be approved by local codes). 
WARNING
•  An external ground may only be used if local codes permit. 
•  Ground sources must be approved by local codes. 
•  Do not connect the ground wire to a gas or hot water pipe. 
•  Use a separate copper wire when installing with an external ground. 
•  A clamp type connector with an external grounding screw is to be used with a minimum No. 10 
copper wire when utilizing an external ground. 
•  The approved ground source must have continuity to electrical ground and cannot be interrupted 
by insulating materials. 
•  If an interruption or insulating material is in line of the ground source it must be jumpered with a 4 
gauge minimum wire. 
Electrical Requirements: 
 
Model: 
MWOV301ES MWOV302ES 
Type: 
Single Oven 
Double Oven 
Voltage: 
240 VAC 
240 VAC 
Frequency: 
60 Hz, Single Phase 
60 Hz, Single Phase 
Total Connected Load: 
21.3 Amp 
39.1 Amp 
Circuit Breaker Req.: 
30 Amp (Dedicated) 
40 Amp (Dedicated) 
Wire Connection: 
4 Wire 
4 Wire 
Electrical Requirement Summary Table