Zephyr COKE42BRGX マニュアル

ページ / 23
10
www.zephyronline.com
INTERNAL BLOWER PREPARATION 
1.  Position internal blower inside hood body so 
internal blower collar proturdes though 6” round 
fl ange opening. 
2.  Secure internal blower to internal blower fl ange 
by (4) M4*16 screws from internal blower 
hardware.
3.  Position capacitor box inside hood body and 
secure by (2) M4*8 screws from internal blower 
hardware.
4.  Secure ground wire from capacitor box to 
ground wire rivet nut next to capacitor box.
5.  Connect 9 pin molex connector from internal 
motor to 9 pin molex connector from capacitor 
box cable. Secure cable to hood interior with zip 
tie and zip tie holder.   
6.  Connect 6 pin molex connector from control 
board box to 6 pin molex connector from 
capacitor box cable. Secure cable to hood 
interior with zip tie and zip tie holder.
Installation – 
Internal Blower