Crestron electronic 2-Series Control Processor ユーザーズマニュアル
2-Series Integrated Control Processor
Crestron CP2/CP2E
Module Header Information
After you convert each module in a program, you can convert the program as
described previously: drag the CP2 or CP2E onto the existing control system in
System Views and click Yes to confirm the replacement.
described previously: drag the CP2 or CP2E onto the existing control system in
System Views and click Yes to confirm the replacement.
For further information about compile-time errors and detailed explanations about
working with modules, refer to the SIMPL Windows online help file.
working with modules, refer to the SIMPL Windows online help file.
Establishing Communication with the CP2/CP2E
Before uploading a program to the CP2/CP2E or performing diagnostic functions,
you must connect the control system to the PC. With the CP2, this connection must
be serial; with the CP2E the connection can be either serial or TCP/IP.
you must connect the control system to the PC. With the CP2, this connection must
be serial; with the CP2E the connection can be either serial or TCP/IP.
Serial Connection
Connect the COMPUTER port on the control system to one of the COM ports
(usually COM 1) on the PC. Use a straight-through RS-232 cable with a DB9 male
connector on one end and a DB9 female connector on the other. Most commercially
available cables are acceptable; they should have at least 5 pins for transmit, receive,
ground, and hardware handshaking.
(usually COM 1) on the PC. Use a straight-through RS-232 cable with a DB9 male
connector on one end and a DB9 female connector on the other. Most commercially
available cables are acceptable; they should have at least 5 pins for transmit, receive,
ground, and hardware handshaking.
Open the Crestron Viewport and click Setup | Communication Settings to display
the “Port Settings” dialog box. Then click RS-232 as the connection type.
the “Port Settings” dialog box. Then click RS-232 as the connection type.
The PC communication settings specified here should match the protocol that the
CP2/CP2E expects. The settings are as follows:
CP2/CP2E expects. The settings are as follows:
• Port = COM 1 through COM 8. Select the correct COM port on the PC.
• Baud rate = 115200 (You can set the PC and the control system to a
• Baud rate = 115200 (You can set the PC and the control system to a
different baud rate, by using the Functions | Set Baud Rate command.
• Parity = None.
• Number of data bits = 8.
• Number of stop bits = 1.
• Number of data bits = 8.
• Number of stop bits = 1.
20
• 2-Series Integrated Control Processor: CP2/CP2E
Operations Guide - DOC. 5980