APW Wyott AT/BT Series ユーザーズマニュアル

ページ / 20
4
2. 
ASSEMBLY (REFER TO ILLUSTRATIONS ABOVE)
a) 
Lay the toaster on its side and install the four Adjustable Legs (Item 1) in threaded holes in 
base. Tighten legs with crescent wrench. The unit may be leveled by unscrewing the lower 
insert of each leg. Precise leveling is not required for proper operation of the toaster. Set the 
toaster upright.
CAUTION: DO NOT OPERATE THE TOASTER WITHOUT THE LEGS INSTALLED.
3. 
CONVEYOR INSTALLATION
M-83 Only:
Remove Butter Roller (Item 2) by pushing shaft to the left to disengage. Remove Butter Pan (Item 3) 
by lifting the pan up and off the supporting pins.
M-83/M-83D:
a) 
Remove Top Front Panel (Item 4A) by gripping the two black knobs while lifting up and 
slightly back. The Bottom Front Panel (Item 4B) can then be removed by grasping the top 
edge with one hand and pulling straight back. Hold the bottom with the other hand and lift up 
and toward the front; then slide panel down and out underneath the Butter Roller bushings.
b) 
Grasp Conveyor (Item 5) by the handles. Lower conveyor knobs into right and left Hangar 
Brackets (Item 6A/B). Gently push forward to engage gears.
CAUTION: THE CONVEYOR IS HEAVY. DO NOT DROP INTO POSITION. DROPPING 
MAY CAUSE DAMAGE TO GEARS.
c) 
Replace Bottom Front Panel (Item 4B), Top Front Panel (Item 4A), Butter Pan (Item :3) and 
Butter Roller (Item 2)
M-91 :
a) 
The Conveyor (Item 5) is shipped in place and strapped down with nylon tie. To remove 
nylon tie
follow steps b, c and d.
.
b) 
Remove Butter Roller (Item 2)  by pushing shaft to the right to disengage. Remove Butter 
Pan (Item 3) by sliding toward the front of the unit, underneath the Butter Roller Bushings.
c) 
Remove Front Panel (Item 4) by gripping the top edge with one hand and the bottom edge 
with  the  other  hand.  Lift  up  to  disengage  slots  in  panel  from  retaining  rods,  then  move 
forward and slide down and out underneath the Butter Roller Bushings.
d) 
Cut and remove the nylon tie securing the conveyor. (Note: To remove for cleaning, see 
"Disassembly" Instructions.)
e) 
Replace Front Panel (Item 4), Butter Pan (Item 3) and Butter Roller (Item 2).
M-95
a) 
The Conveyor (Item 5) is shipped in place and strapped down with nylon tie. To remove 
nylon tie, follow steps b, c, and d.
b) 
Remove Butter Roller (Item 2) by lifting left side of butter roller shaft. Remove Butter Pan by 
sliding toward the front of the unit, underneath the butter roller bushings.
1
1
1
2
2
2
3
3
3
4A
4A
4B
5
5
5
6B
6A