Mitsubishi Electronics AD75M1/M2/M3 ユーザーズマニュアル
11 - 36 11 - 36
MELSOFT
11. POSITIONING DEBUGGING
11.2.5 OPR test
PURPOSE
Make the OPR test to correct the OPR basic and extended parameters and set up
the original point.
the original point.
BASIC OPERATION
1. Perform the basic operation in Section 11.1.2 to start operation monitor.
2. Click the [Online]
2. Click the [Online]
→ [Test] → [Test start] menu (
).
3. Click the "OK" button in the test mode start confirmation dialog box.
4. Click the "Ope. Test" button on the operation monitor main screen.
5. Click the <<OPR>> tab in the Test data set dialog box.
6. Perform the OPR test.
7. To end the OPR test, click the [Online]
4. Click the "Ope. Test" button on the operation monitor main screen.
5. Click the <<OPR>> tab in the Test data set dialog box.
6. Perform the OPR test.
7. To end the OPR test, click the [Online]
→ [Test] → [Test start] menu (
).
8. Clicking the "OK" button in the test mode end confirmation dialog box returns to
the operation monitor status.
DISPLAY/SETTING SCREEN