Sterling SGFE ユーザーズマニュアル

ページ / 50
3.5. Star ting  the  con vey ing  pro ce du re
Set the on/off switch in po si ti on ”ON”.
&
If  the hop per loa der re ports a lack of ma te ri al, the con vey ing
is start ed.
3.6. The  first  con vey ing  ope ra tions
F
Check  the  ro ta tio nal  di rec ti on  of  the  va cu um  ge ne ra tors.
Check the line sys tem.
Ad ju sting  the  suc ti on  tube.
Ma te ri al co ming from the hop per loa der du ring the first con -
vey ing may not be used.
8
1
6-
4
M
S
Star ting  the  con vey ing  pro ce du re
Start-up  3-7