Perlick 63134-3 ユーザーズマニュアル
2
Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice.
Installation –
Beer Pump Panels
■
Use panel as a template to mark where holes
should be drilled on cooler wall.
(Note: Make sure panel is level and pumps are
in the vertical position).
should be drilled on cooler wall.
(Note: Make sure panel is level and pumps are
in the vertical position).
■
Drill
9
/
64
” pilot holes in cooler wall. Use fasteners
provided in installation kit to mount the beer
pump panel to the cooler wall.
pump panel to the cooler wall.
■
Push CO
2
supply line over Keg Pressure
Supply barbed inlet.
(See diagram on page 3).
Position clamp over joint and tighten.
(Note: A
safety Relief Valve should be installed between
supply tank and shut-off point on carbon dioxide
supply line. Relief setting depends on maximum
system pressures).
supply tank and shut-off point on carbon dioxide
supply line. Relief setting depends on maximum
system pressures).
■
Push air or CO
2
supply line over Beer Pump
Pressure barbed inlet.
(See diagram on page
3).
Position clamp over joint and tighten. If
using compressed air, make sure air supply
is clean and dry. Air must have a pressure
dew point of 30°F. or lower to ensure pumps
operate properly.
is clean and dry. Air must have a pressure
dew point of 30°F. or lower to ensure pumps
operate properly.
CAUTION: IF USING CO
2
AS A
PRESSURE SUPPLY FOR PUMPS,
PUMP EXHAUST MUST BE VENTED
TO A WELL VENTILATED AREA TO
AVOID POSSIBLE ASPHYXIATION.
PUMP EXHAUST MUST BE VENTED
TO A WELL VENTILATED AREA TO
AVOID POSSIBLE ASPHYXIATION.
■
Push beer line (from trunk housing) over barbed
Liquid outlet on flow reversal valve.
Liquid outlet on flow reversal valve.
(see diagram on page 3)
. Position clamp over
joint and tighten.
■
Push connector hose over Liquid inlet on beer
pump inlet fitting.
pump inlet fitting.
(See diagram on page 3)
.
Position clamp over joint and tighten. (Note:
Connector hose should not exceed 10 feet in
length)
length)
.
■
Install washer into hex nut on opposite end of
connector hose. Connect to top threaded fitting
of Perlick Smart Coupler.
connector hose. Connect to top threaded fitting
of Perlick Smart Coupler.
■
Cut a piece of CO
2
tubing and push one end
onto barbed CO
2
outlet.
(See diagram on
page3)
. Position clamp over joint and tighten.
Push the other end over the barbed gas inlet on
the Perlick Smart Coupler. Position clamp over
joint and tighten.
the Perlick Smart Coupler. Position clamp over
joint and tighten.