Kobe Range Hoods CH0136SQB ユーザーズマニュアル

ページ / 36
 
STAND ALONE INSTALLATION 
 
***Follow these installations only if installing with an optional duct cover: 
 
Preparation Before Installation 
NOTE:  TO  AVOID  DAMAGE  TO  YOUR  HOOD, 
PREVENT  DEBRIS  FROM  ENTERING  THE 
VENT OPENING. 
 
  Decide  the  location  of  the  venting  pipe  from  the 
hood to the outside. Refer to Figure 9. 
  A  straight,  short  vent  run  will  allow  the  hood  to 
perform more efficiently. 
  Try to avoid as many transitions, elbows, and long 
run as possible. This may reduce the performance 
of the hood. 
  Use  duct  tape  to  seal  the  joints  between  pipe 
sections. 
  If  necessary,  prepare  back  wall  frame  with  cross 
framing lumber for secure installation. 
  Using  references  in  Table  2  and  Measurements 
and Diagrams on pages 19-20, decide the level of 
the lumber.  Refer to Figure 10. 
Hood Preparation Before Installation 
 
  Temporarily  wire  the  hood  to  test  for  proper 
operation before installing. 
  Important:  Peel  protective  film  off  the  hood 
and the duct cover (if any). 
  Attach ducting transition to hood exhaust with ten 
(3/16”  x  3/8”)  screws  (provided).    Refer  to  Figure 
11. 
  Use  eight  (3/16”  x  3/8”)  screws  (provided)  to 
attach the two hood-mounting brackets (provided) 
to the back of the hood.  Refer to Figure 12. 
 
Hood Installation 
CAUTION:  If  moving  the  cooking  range  is 
necessary to install the hood, turn off the power in 
an electric range at the main electrical box.  SHUT 
OFF THE GAS BEFORE MOVING A GAS RANGE. 
 
1.  Using  references  in  Table  2  and  Measurements 
and Diagrams on pages  19-20,  mark the  leveling 
point of the hood.  Position  two  mounting screws 
(not provided) on the wall, leaving 1/8” away from 
the wall. Refer to Figure 13 
 
 
 
 
 
 
 
 
 
 
 
                         Figure 9 
 
 
 
 
 
 
 
 
 
 
                       Figure 10 
         
 
                       Figure 11 
 
                         Figure 12