Cabletron Systems ESX-1320 ユーザーズマニュアル

ページ / 66
Pre-Network Installation Test
ESX-1320/ESX-1380 Installation Guide
3-17
3. Observe the LCD and LANVIEW LEDs. As the ESX progresses 
through bootup, the following messages will be displayed: 
“Cabletron Test in progress” 
The CPU LED illuminates amber. 
“Boot from Flash”
The CPU LED blinks amber and goes off.
“Decompress Image”
“Cabletron ESX-1320” or “Cabletron ESX-1380” (depending on 
the ESX model)
The CPU LED starts blinking green, indicating that the ESX booted 
successfully. If the ESX does not boot successfully, all transmit LEDs 
flash amber for several seconds. If the CPU LED is not green, contact 
Cabletron Systems for assistance. Refer to Chapter 1, Getting Help.
3.8
PRE-NETWORK INSTALLATION TEST
Before connecting the ESX to a live network, you may want to test the 
ESX in a controlled situation to ensure that it is switching packets. You 
can perform this test using two workstations and an ESX. To perform this 
test, refer to Figure 3-13 and proceed as follows:
1. Install and power up the ESX as described in the previous sections. 
2. Connect the first workstation to any ESX interface (except the BRIM 
interface).
3. Connect the second workstation to any other ESX interface (except the 
BRIM interface).
NOTE
Except for the difference in the type of cables (media) needed 
to connect to ports 1 through 12, the following procedure 
applies to both the ESX-1320 and the ESX-1380.