MRV Communications TS5000/XYZ/V** ユーザーズマニュアル

ページ / 87
M R V   C o m m u n i c a t i o n s ,   I n c .   –   I n s t a l l a t i o n   M a n u a l  
30 
Infrastructure 
The only infrastructure required for operating the transceiver and 
linking the sites is Power and Data/Signal connection to the 
peripheral networking equipment. This must be ready prior to the 
airlink installation
IN OUTDOOR INSTALLATIONS, USE SHIELDED AND 
WEATHERPROOF MATERIALS (CABLES, INLETS, AND 
CONNECTORS) COMPLIANT TO THE SAFETY STANDARD IN 
FORCE.  
 
Power 
 
Source 
 
The power requirement for standard units is 100-240VAC @ 
50/60Hz - 22W.  
Note: Units requiring low Voltage: 35-60VDC - 22W can be factory 
set upon request.  
It is recommended to use Surge Suppression System to avoid 
the damage to the equipment when power supply is unstable. 
Protection should be at least 25,000A min. 
 
Cabling
 
 
 
Standard 3 conductors power cord are required. (See Safety 
requirements, Page iv)  
Data/Signal Cabling 
 
1.   For TS5000/G, TS5000/G-F, TS5000/155 and TS5000/155-F
 
 
Type  
For connecting the Transceiver to the peripheral equipment two optical 
fiber cables are required (one for the transmission and one for the 
reception). The standard recommended cable is a 62.5/125 μm for MM 
fiber and 9/125 μm SM fiber, according to transceiver type used.  
 
Connectors  
Each fiber should be terminated with the ordered type of connector on the 
transceiver end (SC, ST….). 
 
Optical Fiber testing. 
The cabling installer must specify the attenuation of each fiber installed.
 
Chapter 
3