Jacuzzi SUMMER RAINTM 2 WALL & 3 WALL WALK-IN SHOWER SYSTEMS ユーザーズマニュアル

ページ / 32
STEP 13
Turn on water supply and check for leaks.  Correct any
leaks before installing tower cover.
STEP 14
Install tower cover as shown. Insert cover at top first.
3 WALL:  TOWER AND CURVED GLASS INSTALLATION
TOWER COVER
INSERT THIS SIDE FIRST
TOWER COVER
TOWER TOP PLATE
STEP 15
Seal all around the base of tower with silicone sealant.
Also seal the inside of both wall posts, bottom of both
glass panels on the inside only.
22
TOP VIEW
(RAILS  NOT SHOWN)
APPLY SEALANT
ALONG BASE
OF GLASS
APPLY SEALANT
ALONG BASE
AND SIDE OF
WALL POST
APPLY SEALANT
ALL AROUND
TOWER BASE