GSI Outdoors PNEG-1521 ユーザーズマニュアル

ページ / 64
INSTALLATION
18
PNEG-1521     Commercial Direct Gear Drive Bin Sweep Auger
E. Thread the 1” External Control Pipe Coupler onto
the Intermediate Control Rod. Also thread the ½”
Internal Control Pipe Coupler onto the Centerwell
Control Rod.
5. OUTER UNLOAD TUBE ASSEMBLY INSTALLATION
(Cont.)
CENTER OF BIN
Inside Intermediate
Control Rod
1” External Control
Pipe Coupler
1/2” Internal Control
Pipe Coupler
Centerwell
Control Rod
Centerwell Control Rods
Inside Intermediate
Control Rods
FIG. 5-D
CENTER OF BIN
FIG. 5-E
F.
Thread the other Centerwell Rod onto the ½”
coupler and leave it slightly loose. Also thread the
other Intermediate Rod onto the 1” coupler.