GSI Outdoors PNEG-1521 ユーザーズマニュアル

ページ / 64
INSTALLATION
23
PNEG-1521     Commercial Direct Gear Drive Bin Sweep Auger
A. Install the longest section of the ½” Clutch Control
Rod to the Clutch Control Arm on the Centerwell.
Make sure that it is contained in the square Clutch
Control Pipe Guides on the Intermediate Wells.
Bolt the Rod to the Arm with a 5/16" x 1-¾” Hex
bolt and Nylock nut.
9.  CLUTCH CONTROL INSTALLATION
B. Connect the two Clutch Control Rods by threading
the ½” Internal Pipe Connector halfway onto the
Rod attached to the Centerwell. Bring the other
Clutch Control Rod up to it by running the Rod
through the Clutch Control Pipe Position Lock in
the Bin Flange, threaded end first, and making
sure that the Rod is contained by the Guides on
the Intermediate Wells. Then thread the Rod onto
the remaining threads on the Coupler.
On 36’ and 42’ diameter bins, the Clutch Control Rod will come preassembled,
and shipped inside the Unload Flight.
Centerwell
5/16” x 1-3/4”
Hex Bolt
5/16” Nylock Nut
Clutch Control Rod
Long Clutch Control Rod
Clutch Control Pipe
Position Lock
 Clutch Control Arm
 Clutch Control Pipe Guides
Short Clutch Control Rod
CENTER OF BIN
1/2” Internal Control Pipe Coupler
Clutch
Control Arm
FIG. 9-A
FIG. 9-B
FIG. 9-C