Avaya IP Office Phone ユーザーズマニュアル

ページ / 86
Page 34 - Power Supply requirements 
Preparing for Installation 
Page 34 - Preparing for Installation 
IP Office Installation Manual 
Power Supply requirements 
40DHB0002USCL – Issue 9 (28th October 2003) 
Power Supply requirements 
IP Office  Base Units and Expansion Modules should only be connected to a clean power 
supply or a UPS. 
Check the following: 
–  IP Office Base Unit and Expansion Modules : 
IP Office modules require a separate switched mains supply. Power on the Expansion 
Modules first. If the main IP Office Module does not detect an item at power on, it will 
never use it. If power is switched on from a central point for all modules, then, as the 
main unit is the slowest to start, this will be taken care of automatically.  
–  Standard Lump-in-Line Power Supply units are supplied with each IP Office/Expansion 
Module. However, for IP400 Digital Station 30s that use more than ten 4424 terminals, 
the 80W Lump-in-Line Power Supply must be used. This must be ordered separately 
(see page 30). The power leads are country specific and must be ordered separately 
(see page 30). 
 
CAUTION:   The Lump-in-Line PSUs supplied with each IP Office module must only be 
connected to a 50/60Hz, 100-240V power source. 
 
–  UPS Equipment : 
The use of UPS's to support the IP Office system during mains power failure is highly 
recommended. Such equipment also provides mains conditioning. Contact Avaya for 
details of preferred and tested suppliers and models.